Backend Engineering vs Effective Cost

X = effective cost (log). Y = Backend Engineering IQ. Color = provider.

Backend Engineering vs Effective Cost
X = effective cost (log). Y = Backend Engineering IQ. Color = provider.
Controls:
Production Eng.1:1Cost

How to read this chart

Each point is a public model. The chart compares Backend Engineering IQ against Effective Cost (per 1M I/O Tokens), with color showing the model provider.